I now have the framing done on the box that holds the actual fireplace
itself. There is still more framing to do above the fireplace to enclose
where the vent pipe will be. I also ran the natural gas line, and relocated
the electrical, cable, and ethernet feeds that were on the wall behind the
fireplace.